The Eastern Section between Tsung Yuen Ha and Lin Ma Hang of the Lin Ma Hang Road Widening Works is a Designated Project under the Environmental Impact Assessment (EIA) Ordinance. A series of surveys and investigations were completed. Considering factors such as environmental impacts, land issues, traffic flow, and other engineering elements, we have formulated the preliminary design scheme for the project. The preliminary design scheme for the Eastern Section proposes to widen the existing 3.5m wide singe track access road to a standard 6.75m wide single two-lane carriageway with 2m wide footpath on one side of the carriageway. We are now inviting public views to refine the design of the road and associated facilities.